V SKETCH BUILD
Epoxy & PU Flooring Systems
Plan seamless flooring around the way your space operates, from workshops and warehouses to commercial interiors and specialist service areas.

Understanding your requirement
A flooring system should be selected around the substrate and operating conditions. We review concrete condition, expected traffic, cleaning practices and the required finish before recommending epoxy or PU options. Surface preparation and installation scheduling are part of the proposal, with thickness, texture and performance requirements confirmed for the chosen system.
Products and system options
- Epoxy floor coatings and self-levelling systems.
- PU flooring options for the reviewed application.
- Anti-slip surface finishes and selected decorative finishes.
- Floor markings, walkways and designated work zones.
- Repair and recoating of suitable existing resin floors.
What our service can include
- Review floor condition, area and current use.
- Coordinate substrate preparation and local repairs.
- Agree system build-up, finish, colour and application requirements.
- Install the specified primer and flooring layers.
- Coordinate markings, completion review and return-to-use instructions.
Choosing a suitable solution
- Traffic type, loads and operational activity.
- Substrate condition and moisture assessment requirements.
- Chemical, thermal or cleaning exposure to be reviewed for system selection.
- Slip-resistance needs, downtime and maintenance priorities.
How we work with you
- Review use, floor condition and performance needs.
- Select the system and agree preparation and downtime.
- Coordinate application and curing.
- Review the finish and explain care and reopening requirements.
Maintenance and continuing support
We can discuss cleaning guidance, local damage repair and future recoating. Product performance, application limits and reopening times are confirmed for the specified system; not every epoxy or PU option suits every environment.
Your agreed proposal
After reviewing your requirement, we confirm the products, specifications, work included, responsibilities, pricing and expected schedule. Supply, installation and continuing service arrangements are identified clearly in the proposal.
RELATED SOLUTIONS
